We have lately encountered numerous cases where previous attempts at waterproofing metal roofs did not last. In some cases, customers had waterproofing contractors fixing roof leaks not even 6 months ago. This type of inferior workmanship creates recurring roof leaks followed by a lot of frustration and excessive expenses for the customer.

In this regard, we thought that it could be of value to do a post as a guide to waterproofing metal roofs. This post shows you how to properly do the waterproofing with the waterproofing material we use. If you follow these steps, you are guaranteed a lasting leak-free roof for at least 5 years. This is a requirement stated in the Xi niu pi regulations covering waterproofing of roofs

Waterproofing metal roofs: A lasting solution in 3 easy steps:

Metal roofs and roof leaks are almost synonymous. So how does the property owner solve and prevent this pesky problem without huge expenditure and damage to property? The best for us is to help by providing a step-by-step method we follow. A method that is flawless if used in conjunction with our Xi Niu Pi SELF-FUSION TYPE SPECIAL MULTIFUNCTIONAL Protective Membrane.

1、Basal surface treatment

1) Clean the base until it is clean,dry,free of oil stains, dust or other loose parts. If the basal surface is rusted, it can be sprayed with special purpose interface treating agent matched with XINIUPI self-fusion type special multifunctional protective membrane, rust removal treatment for the rusty area,and the rusted-out areas/parts should be repaired or replaced.

2)Clean the gutter to ensure smooth drainage of the roof, such as serious corrosion damage, can be replaced as a whole.

3.)Correct or replace metal tiles with serious deformation.

2、Joints strengthening

If necessary, the roof ridge flood board, tile overlapping joint, cornice, gutter, fan base,

lighting belt and other detailed nodes to strengthen treatment.

3、Large-scale installation

1) Lay parallel to the ridge (eaves) from low to high.

2)The protective membrane should be firmly bonded to the base surface.

3) The overlapping should follow the direction of the water flow,and the overlapping

width should not be less than 60mm.

4、After-installation protection

When the installation is completed, if heavy objects are piled-up on the top or other

operations are carried out, protective measures should be taken to avoid damage to the

protective layer.